Client: Murray Zircon
Project: Mercunda Mineral Sand Mine Site Infrastructure
Category: Mining Infrastructure
Budget: $4M+
Date: 2022 – 2023
Location: SA
The awarded works were for Civils & Concrete works which included the following:
- Topsoil & Subsoil Stripping
- Qty 25,000m3 to stockpile.
- Earthworks Cut to Fill (10,000m3)
- Imported Fill (7,000m3 from BP#1)
- Pad & Road Preparation (60,000m2)
- 1km of Roadworks
- Over 40k of material crushed to various specifications
- Supply of 43 Precast Footings off site
- 9 major Footings insitu, on site
- All Footings built to be movable / mobile
- Mobile Processing Plant
These works for the site establishment were delivered using varying sizes of articulated dump trucks, scrapers and excavators.