Client: Murray Zircon
Project: Mindarie Mineral Sands Mine
Category: Mining
Budget: $380M+
Date: 2023 – current
Location: SA
Some of the scope for this contract includes the following:
- Development and maintenance of all lay-down areas and haul roads, including dust suppression, drainage, waste and hydrocarbon management necessary for the provision of the services
- Stripping, placement and return of topsoil and subsoil in accordance with the TS/SS mine plan
- Removal, placement and return of overburden from the mining path averaging over 1Mbcm/month for the 60-month term of the contract
- Total material movement (TS/SS plus overburden and return) peaks at 2Mbcm per month
- Ore feed to the mobile mining unit (MMU) at over 750t/hr
- Progressive rehabilitation of the mined strandlines