Client: Galaxy Resources Limited
Project: Mt Cattlin Spodumene Project
Category: Contract Mining
Budget: >$140M+
Date: March 2020
Location: WA
The scope of works includes:
- Load and haul and rehandle of over 16 million BCM of ore and waste from two large open pits
- Waste rock stockpile management
- Haul road construction
- Rehabilitation and haulage of process rejects to stockpile
Mining is undertaken using hydraulic excavator and truck operations, delivering ore to the Run of Mine (ROM) stockpiles for crushing and processing in the dense medium separation (DMS) gravity recovery circuit to produce a high-quality lithium concentrate.