In 2015, Lucas TCS established a collaboratively client contractor relationship with Peregrine Corporation assisting in the successful delivery of multiple contracts conducive with the final delivery of The Bend Motorsport Park Precinct.

Client: Peregrine Corporation

Project: The Bend Motorsport Park Construction

Category: Civil Construction

Budget: >$50M

Date: 2015

Location: SA

The Bend Motorsport Park’s Main Racing Circuit is Australia’s only circuit to comply with the latest FIA Grade 2 and FIM Category A standards. At 7.7km the award-winning track is the second longest permanent racetrack in the world. The circuit is made up of 35 technical corners, fast flowing sections, a 1km long main straight, 15m wide, a 54m long emergency underpass and an aggregate rise and fall of 85 metres, all constructed from a greenfield site on a bed of sheet rock.

In addition to the initial award, construction and delivery of the main racing circuit, we have been awarded several contracts to assist with the entire park construction some of these include:
  • Rally and 4WD Track
  • The Bend Spectators Roads
  • The Bend Roads C1 and D
  • The Bend Stadium Circuit
  • The Bend Road A2 Construction
  • The Bend Road E and Subdivision
  • The Bend Access Points
  • Construction of large concrete 4m width 50m length underpass
  • The Bend OTR Civils
  • The Bend Fuel Distribution Centre
  • The Bend Stadium Circuit Combined Services
  • The Bend Workshop Construction Civil Works

The Main Racing Circuit (MRC) was designed to be ‘World Class’, so construction needed to be ‘World Class’, combining innovative engineering and construction solutions to a technically complex project.

Contact us today and see how we can help you achieve Solutions that surpass your expectations.