In 2018, Lucas TCS were contracted by Maritime Constructions for the civil works associated with the construction of the Thevenard Marine Offloading Facility, a purpose built facility for the loading and unloading of commercial fishing vessels.

Client: Maritime Constructions 

Project: Thevenard Marine Offloading Facility

Category: Marine

Budget: $2M+

Date: 2018 – 2019

Location: SA

Lucas TCS’ scope included three distinct activities which were undertaken in stages.

The first was the placement and compaction of core fill, placement of geotextile fabric and the placement of the primary and secondary rock armour.

Lucas TCS were also responsible for the establishment and maintenance of a haul road between the pit and the project site and the supply and installation of the stormwater system.

Each activity was run in sequence over a length of the breakwater based on forecasted weather and tide events to ensure that the potential for erosion was reduced.

Contact us today and see how we can help you achieve Solutions that surpass your expectations.